Video of trail construction at LBJ

Here’s a video posted by LBJ Express that provides a look at upcoming construction where the White Rock Creek Trail goes under the LBJ freeway reconstruction project. They also continue to say that the trail will reopen in the Spring of 2013.

“Here’s a 4D look at construction of the LBJ Express project over the White Rock Hike and Bike Trail near Hillcrest and LBJ. The width of the overpass almost doubles with the addition of elevated bypass lanes, general purpose lanes on the outside and managed lanes in each direction in the center. Construction on the lanes over the trail is expected to begin spring of 2013.”

“The (elevated) bypass lanes will reduce the amount of traffic at the frontage roads as it will allow for grade separated movement past the (trail) stops signs on both north and south sides of LBJ.”

Share
This entry was posted in construction, LBJ project, trail closures. Bookmark the permalink.

5 Responses to Video of trail construction at LBJ

  1. Brian says:

    What plugin is that? It’s not supported by my phone’s browser. Is it not available in a standard format?

  2. fwrct says:

    It’s a YouTube video. Guess you need a YouTube viewer on your phone.

  3. Johnny says:

    The video doesn’t even attempt to play on my phone, laptop, tablet or desktop. If the video does play for you, here’s a link to it on YouTube: https://www.youtube.com/watch?v=ABeAo7WP0mY

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>